High-voltage field-effect transistor having multiple implanted layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9660053
APP PUB NO 20150014770A1
SERIAL NO

13941119

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for fabricating a high-voltage field-effect transistor includes forming a body region, a source region, and a drain region in a semiconductor substrate. The drain region is separated from the source region by the body region. Forming the drain region includes forming an oxide layer on a surface of the semiconductor substrate over the drain region and performing a plurality of ion implantation operations through the oxide layer while tilting the semiconductor substrate such that ion beams impinge on the oxide layer at an angle that is offset from perpendicular. The plurality of ion implantation operations form a corresponding plurality of separate implanted layers within the drain region. Each of the implanted layers is formed at a different depth within the drain region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • POWER INTEGRATIONS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Banerjee, Sujit San Jose, US 81 860
Parthasarathy, Vijay Sunnyvale, US 116 1249

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00