Phase change memory structure to reduce leakage from the heating element to the surrounding material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9660188
SERIAL NO

14471082

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A phase change memory (PCM) cell with a heating element electrically isolated from laterally surrounding regions of the PCM cell by a cavity is provided. A dielectric region is arranged between first and second conductors. A heating plug is arranged within a hole extending through the dielectric region to the first conductor. The heating plug includes a heating element running along sidewalls of the hole, and includes a sidewall structure including a cavity arranged between the heating element and the sidewalls. A phase change element is in thermal communication with the heating plug and arranged between the heating plug and the second conductor. Also provide is a method for manufacturing the PCM cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Chern-Yow Chu-Bei, TW 134 727
Lin, Po-ken Hsinchu, TW 6 57
Liu, Shih-Chang Alian Township, TW 305 2186
Wu, Chang-Ming New Taipei, TW 99 619

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00