Switching converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9660518
SERIAL NO

13875415

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switching converter in which deterioration and breakage can be suppressed is provided. A switching converter whose area can be reduced is provided. The switching converter includes a switch connected to a power supply portion; a transformer connected to the power supply portion; a first rectifying and smoothing circuit and a second rectifying and smoothing circuit each connected to at least the transformer; and a switching control circuit which is connected to the first rectifying and smoothing circuit and the second rectifying and smoothing circuit and which controls operation of the switch. The switching control circuit includes a control circuit controlling on/off of the switch and operation of a starter circuit; and the starter circuit controlling startup of the control circuit. The starter circuit includes a transistor and a resistor each including a wide-gap semiconductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDJAPAN'S KANAGAWA PREFECTURE ATSUGI CITY ATSUGI-SHI KANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noda, Kosei Kanagawa, JP 186 3625
Nomura, Masumi Kanagawa, JP 33 496

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00