Brushless motor and wiper apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9660559
SERIAL NO

14394628

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brushless motor comprises: a stator 21 having armature coils 21a, 21b, and 21c; a rotor 22 which is rotated by a revolving magnetic field; and a switching element 30a, wherein the brushless motor has a rotation number control unit 33 which switches between low-speed and high-speed mode, wherein in the low-speed mode, the rotation number control unit 33 supplies current to the armature coils 21a, 21b, and 21c at predetermined energization timing and controls a duty ratio to control the rotation number of the rotor 22, and in the high-speed mode, the rotation number control unit 33 supplies current to the armature coils 21a, 21b, and 21c at energization timing advanced from the energization timing for the low-speed mode, thereby performing field weakening control of weakening the revolving magnetic field from that of the low-speed mode to control the rotation number of the rotor 22.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBA CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Annaka, Tomohiko Gunma, JP 10 22
Iwazaki, Tamotsu Gunma, JP 12 34
Kimura, Masaaki Gunma, JP 63 713
Kitazawa, Junya Gunma, JP 3 12
Kojima, Naoki Gunma, JP 49 264
Tanaka, Hiroto Gunma, JP 46 431

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00