Aircraft, missile, projectile, or underwater vehicle with improved control system and method of using

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9664485
SERIAL NO

14322548

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aircraft, missile, projectile, or underwater vehicle with an improved control system, an improved control system, or a method of maneuvering an aircraft, missile, projectile, or underwater vehicle uses control surfaces that are movable along a track. The control system on a track (or “tracked control surface”) advantageously enables the aircraft, missile, projectile, or underwater vehicle to have an unlimited number of configurations, each configuration being tailored to the specific stability or maneuverability requirements during a specific portion of the flight by adjusting the center of pressure of the aircraft, missile, projectile, or underwater vehicle relative to its center of gravity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ORBITAL RESEARCH INC4415 EUCLID AVE SUITE 500 CLEVELAND OH 44103

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ng, T Terry Sylvania, US 8 52
Patel, Mehul P Chandler, US 9 181
Suchy, Paul Parma, US 10 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00