Nuclear power plant control system and method of testing nuclear power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9666316
APP PUB NO 20130301771A1
SERIAL NO

13825256

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nuclear power plant control system (1) includes a control button (21) which receives an operation for controlling a control target device (40), a notification lamp (12) which notifies that a control signal corresponding to the operation received by the control button (21) arrives at a predetermined position on a path connected from a control panel (20) to the control target device (40), and a control signal inhibition unit (33) which inhibits a control signal from arriving at the control target device (40) in midstream between the predetermined position on the path and the control target device (40) in response to an operation received by a test permission button (11).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI HEAVY INDUSTRIES, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akizuki, Yasutake Tokyo, JP 7 8
Fujimoto, Hiroshi Tokyo, JP 213 2411
Fukui, Toshiki Tokyo, JP 8 8
Kiuchi, Shinji Tokyo, JP 7 8
Shinohara, Hironobu Tokyo, JP 24 94
Shirasawa, Hiroshi Tokyo, JP 22 78
Tanaka, Yuichi Tokyo, JP 97 759

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00