Solar cell module manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9666740
SERIAL NO

15069977

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar cell module manufacturing method includes: preparing a front-side transparent protective member and a back-side protective sheet member, the front-side transparent protective member including a first principal surface and a second principal surface, a surface area of at least the first principal surface being larger than a projected area of the first principal surface, the back-side protective sheet member including a third principal surface and a fourth principal surface; and disposing a solar cell between the second principal surface of the front-side transparent protective member and the third principal surface of the back-side protective sheet member, and sealing the solar cell with a bonding layer therebetween. A breaking elongation of the back-side protective sheet member is 300% or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakamura, Kei Osaka, JP 45 682
Takenaka, Masaharu Osaka, JP 4 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00