Voltage monitoring control device and voltage monitoring control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9667100
SERIAL NO

14900887

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A centralized voltage control device connected to a first local voltage control device adjusting the control amount every second cycle such that a voltage of a transformer-type voltage control apparatus is maintained within a range between voltage upper and lower limit values updated every first cycle and a second local voltage control device adjusting the control amount of a reactive-power-modified voltage control apparatus every third cycle, wherein the centralized voltage control device includes a load and power-generation-amount estimation unit estimating a load and power-generation-amount distribution every first cycle under condition of a mean load and mean power generation, condition of a minimum load and maximum power generation, and condition of a maximum load and minimum power generation, a voltage-fluctuation-band estimation unit estimating a voltage fluctuation band, an optimal-voltage-distribution determination unit determining a control target value of the first local voltage control device, and a voltage upper-and-lower-limit-value determination unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Itaya, Nobuhiko Tokyo, JP 26 120

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00