Method for producing an R-T-B-M sintered magnet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9672981
SERIAL NO

14334009

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for producing an R-T-B-M sintered magnet having an oxygen content of less than 0.07 wt. % from R-T-B-M raw materials. The composition of R-T-B-M includes R being at least one element selected from a rare earth metal including Sc and Y. The composition also includes T being at least one element selected from Fe and Co. B in the composition is defined as Boron. The composition further includes M being at least one element selected from Ti, Ni, Nb, Al, V, Mn, Sn, Ca, Mg, Pb, Sb, Zn, Si, Zr, Cr, Cu, Ga, Mo, W, and Ta. The present invention provides for a step of creating an inert gas environment in the steps of casting, milling, mixing, molding, heating, and aging to prevent the powder from reacting with the oxygen in anyone of the above mentioned steps.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YANTAI DONGXING MAGNETIC MATERIALS INC265500 YANTAI CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Shengli Yantai, CN 3 5
Ding, Kaihong Yantai, CN 31 7
Li, Wenchao Yantai, CN 12 181
Lin, Xifeng Yantai, CN 1 2
Peng, Zhong Jie Yantai, CN 1 2
Wang, Yongjie Yantai, CN 10 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00