Lead titanate coating and preparing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9673381
SERIAL NO

14803197

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a lead titanate coating and a preparing method thereof. According to the method, mixed powder is sprayed on the surface of a matrix, and through polarization, the lead titanate coating is acquired. The mixed powder comprises PbTiO3 powder, PbO powder and Al powder. Lead titanate (PbTiO3) is a kind of ferroelectric material, and can be used for preparing a piezoelectric sensor. Besides, the PbO powder and the Al powder are added, so that the piezoelectric property of the lead titanate coating can be improved. Since the lead titanate coating prepared by the present invention can be combined with the matrix closely and the intensity of piezoelectric signal is high, it can be widely applied to mechanical parts, such as a piston ring, a cylinder, a gear, and the like, to dynamically monitor the service situations of the parts better.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WANG HAIDOUDUJIAKAN 21 FENGTAI BEIJING 100072

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Haidou Beijing, CN 17 11
Xing, Zhiguo Beijing, CN 13 8
Xu, Binshi Beijing, CN 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00