Secondary battery pack based on mechanical connection manner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9673540
SERIAL NO

12669401

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is a battery pack constructed in a structure in which a plurality of secondary battery cells are electrically connected to one another via a connection member while the secondary battery cells are mounted in a receiving part of a pack case having no partition, wherein the connection member is located between the battery cells arranged in the longitudinal direction or in both the longitudinal direction and the lateral direction, the connection member is connected, in a mechanical coupling manner, to a lower electrode terminal of the front battery cell in the longitudinal direction and/or to an upper electrode terminal of the rear battery cell in the longitudinal direction, and the connection member is elastically pressed while the connection member is located between the battery cells.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bang, Seunghyun Seoul, KR 20 142
Cho, Yongho Chungcheongbuk-Do, KR 32 207
Kwon, Gi-Hwan Seoul, KR 10 45
Kwon, Hosang Seongnam-si, KR 9 41
Lee, HakJun Seoul, KR 16 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00