Blow molded airflow conduit with outer insulation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9676137
SERIAL NO

14524417

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a blow molded plastic article wherein the article comprises an airflow conduit, comprising: providing a first sheet of insulation material located on a insulation carrier; providing a blow molding mold including two halves and having a molding surface defining a molding cavity to form the article; locating the insulation carrier between the two halves of the blow molding mold; transferring the first sheet of insulation material from the insulation carrier to the blow molding mold; introducing an extrudate of thermoplastic composition between the two halves of the blow molding mold; closing the blow molding mold; forming the extrudate to a shape of the mold cavity of the blow molding mold to form the article; and bonding the extrudate to the first sheet of insulation material as the extrudate is being formed to the shape of the mold cavity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL AUTOMOTIVE COMPONENTS GROUP NORTH AMERICA, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagy, Paul Macomb, US 2 9
Vanhorn, David Famington Hills, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00