Manufacturing method for mold die, mold and eyeglass lens

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9676157
SERIAL NO

13850761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method for a mold die comprising: making design data for a molding surface based on predetermined prescription information; creating the molding surface in accordance with the design data; specifying error amounts at first and second corresponding points defined on the created molding surface respectively corresponding first and second reference points; defining a first correction surface based on an error amount specified at the first corresponding point; of defining a second correction surface based on the first correction surface and an error amount specified at the second corresponding point, wherein the second correction surface has no power at the first corresponding point; combining a design surface by the design data, the first correction surface and the second correction surface, and corrects the design data based on combined data after the combining; and creating the molding surface in accordance with the corrected design data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HOYA CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tanaka, Takao Tokyo, JP 62 394

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00