System and method for controlling vehicle components based on camera-obtained image information

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9676386
APP PUB NO 20160355182A1
SERIAL NO

14730080

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments of the present disclosure provide systems and methods for provide monitoring a vehicle's surroundings, predicting when a navigation route will pass through a closed road, preemptively modifying the navigation route to avoid the closed road, identifying changes in speed limit, and identifying dangerous debris in the roadway. One embodiment of the camera-based vehicle control system includes a camera configured to obtain image information and a processor configured to: analyze the image information; if a reroute condition is satisfied based on the image information, implement an alternate navigation route; if a threat condition is satisfied based on the image information, cause an output device to output a threat alert; and if a speed condition is satisfied based on the image information, modify a vehicle speed setting.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FORD GLOBAL TECHNOLOGIES, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Neubecker, Cynthia M Westland, US 66 526
Remillard, Jeffrey Thomas Ypsilanti, US 37 723
Shutko, John Ann Arbor, US 43 3750

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00