Method and elevator arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9676595
APP PUB NO 20130118838A1
SERIAL NO

13678774

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing an elevator includes installing a movable supporting platform and an elevator car in the elevator hoistway; taking the elevator car into use to serve passengers and/or to transport goods; removing the elevator car from use; changing the service range of the elevator car to reach higher up in the elevator hoistway by lifting the supporting platform higher up in the elevator hoistway; and taking the elevator car back into use. The elevator is reeved to include construction-time hoisting roping, which includes one or more ropes, the longitudinal power transmission capacity of which is based at least essentially on non-metallic fibers in the longitudinal direction of the rope. In the method, guide rails to be fixed with guide rail brackets can additionally be installed by the aid of an installation device. An elevator arrangement can be used to perform the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KONE CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Plathin, Antti Vantaa, FI 7 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00