Structural concrete mix for construction for electromagnetic wave/pulse shielding

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9681592
SERIAL NO

14392258

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Conductive concrete mixtures are described that are configured to provide EMP shielding and reflect and/or absorb, for instance, EM waves propagating through the conductive concrete mixture. The conductive concrete mixtures include cement, water, conductive carbon material, magnetic material, and metallic conductive material. The conductive carbon material may include conductive carbon particles, conductive carbon powder, and/or coke breeze. The metallic conductive material may include steel fibers, and the magnetic material may include taconite. The conductive concrete mixture may also include supplementary cementitious materials (SCM). A method of making a concrete structure includes pouring a concrete mixture to form conductive concrete, and positioning a first conductive screen within the conductive concrete proximate to an exterior surface of the conductive concrete. The method also includes positioning a second conductive screen within the conductive concrete in electrical contact with the first conductive screen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUTECH VENTURES2021 TRANSFORMATION DRIVE SUITE 2220 LINCOLN NE 68508

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nguyen, Lim Bellevue, US 15 119
Tuan, Christopher Omaha, US 7 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00