Method for preparation of artificial blood vessel using tube-type porous biodegradable scaffold having a double-layered structure and stem cell, and artificial blood vessel made by the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9683216
SERIAL NO

13299748

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for preparation of an artificial blood vessel using a tube-type porous biodegradable scaffold having a double layered structure and a stem cell, and an artificial blood vessel made by the same. Specifically, the present invention relates to a method for preparation of an artificial blood vessel by separately seeding a stem cell onto the inner membrane and an outer membrane of a tube-type porous biodegradable scaffold having a double layered structure, wherein the inner membrane and the outer membrane having different biodegradable polymer nano-fiber arrangements are continuously linked, and by inducing differentiation; and an artificial blood vessel made by the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INJE UNIVERSITY INDUSTRY-ACADEMIC COOPERATION FOUNDATIONGIMHAE-SI GYEONGSANGNAM-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Dong-Hwa Gimhae-si, KR 3 13
Shin, Jung-Woog Busan, KR 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00