Turbine for a hydroelectric power plant and hydroelectric power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9683537
SERIAL NO

14356338

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a turbine for a hydroelectric power plant comprising a hub, a plurality of turbine blades provided on the hub, a pitch angle adjusting unit coupled to the turbine blades for adjusting the pitch angle of the turbine blades, a double-acting hydraulic cylinder and a piston rod connected thereto. The piston rod is coupled to the pitch angle adjusting unit in such a way that the pitch angle adjusting unit performs a rotational movement when the piston rod is moved in the longitudinal direction. The double-acting hydraulic cylinder is provided in a hydraulic chamber coupled by way of a first and a second hydraulic line so that the double-acting hydraulic cylinder is displaceable by feed of a hydraulic fluid through the first or second hydraulic line and thus leads to adjustment of the pitch angle of the turbine blades by way of the coupling to the piston rod and the pitch angle adjusting unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WOBBEN PROPERTIES GMBH26607 AURICH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hauser, Jan Niko Aurich, DE 1 2
Lambertz, Walter Aurich, DE 2 2
Rohden, Rolf Aurich, DE 38 197

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00