Shock absorber

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9683625
APP PUB NO 20160215849A1
SERIAL NO

14916063

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shock absorber includes a piston joined to a piston rod that proceeds into and recedes from a cylinder, an extension-side chamber and a compression-side chamber that are separated from each other by the piston and have a working fluid reserved therein, first and second extension-side discharge passages in which the working fluid discharged from the extension-side chamber flows, an extension-side supply passage in which the working fluid to be supplied to the compression-side chamber flows, first and second compression-side discharge passages in which the working fluid discharged from the compression-side chamber flows, and a compression-side supply passage in which the working fluid to be supplied to the extension-side chamber flows. An extension-side damping valve and a compression-side damping valve are respectively provided in the first extension-side discharge passage and the first compression-side discharge passage. An extension-side electromagnetic pressure control valve and a compression-side electromagnetic pressure control valve, which are respectively provided in the second extension-side discharge passage and the second compression-side discharge passage, are set such that the openings thereof are maximized before the piston speed reaches a high-speed range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KYB CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurita, Norihiko Gifu, JP 10 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00