Control system for nuclear facility and control method for nuclear facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9685246
SERIAL NO

13877233

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system allows controlling a nuclear facility in an evacuation area. The control system includes a control device in ordinary use disposed in a non-evacuation area, an emergency control device—for emergency in the evacuation area, a plant control facility connectable to the control device—and the emergency control device, a signal switching unit that switches from a normal coupling to an emergency coupling based on an emergency switch signal, a first selector switch in the non-evacuation area, a second selector switch-in the evacuation area, an AND circuit configured to output the emergency switch signal to the signal switching unit in the case where the emergency switch signal is input from the first selector switch and the emergency switch signal is input from the second selector switch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI HEAVY INDUSTRIES, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akizuki, Yasutake Tokyo, JP 7 8
Fujimoto, Hiroshi Tokyo, JP 213 2411
Fukui, Toshiki Tokyo, JP 8 8
Kiuchi, Shinji Tokyo, JP 7 8
Shinohara, Hironobu Tokyo, JP 24 94
Shirasawa, Hiroshi Tokyo, JP 22 78
Tanaka, Yuichi Tokyo, JP 97 759

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00