High efficiency phase splitter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9687757
SERIAL NO

13816192

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A phase splitter for separating a multiphase fluid into a relatively light phase and a relatively heavy phase includes a separator tube which comprises a fluid inlet through which the multiphase fluid enters the apparatus, a heavy phase outlet through which the heavy phase exits the apparatus and an inner diameter surface which defines a flow bore that extends between the fluid inlet and the heavy phase outlet. A swirl element positioned in the flow bore downstream of the fluid inlet causes the multiphase fluid to rotate and separate the heavy phase from the light phase. The light phase forms an elongated core which extends axially through the flow bore radially inwardly of the heavy phase from proximate the swirl element toward the heavy phase outlet. A core stabilizer is positioned in the flow bore between the swirl element and the heavy phase outlet and engages the distal end of the light phase core to thereby inhibit the light phase from exiting the apparatus through the heavy phase outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FMC SEPARATION SYSTEMS BV1076 EE AMSTERDAM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akdim, Mohamed Reda Nieuwegein, NL 11 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00