Process for manufacturing elastic roller, and coating apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9687871
APP PUB NO 20160089687A1
SERIAL NO

14856867

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided that a process for manufacturing an elastic roller having a mandrel and a coating film. The process comprise a first step of forming a coating film on an outer peripheral surface of a first mandrel, and a second step of forming a coating film on an outer peripheral surface of a second mandrel. The process further comprises a cleaning step between the steps. The cleaning step comprising: making a cleaning member arranged coaxially with the central axis of a circular coating head, in a downstream side in a moving direction of the first mandrel with respect to the circular coating head, making the cleaning member relatively approach the circular coating head; bringing a surface to be cleaned into contact with the cleaning member; rotating the cleaning member while the surface comes in contact with the cleaning member; and inserting the cleaning member into the center hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHATOKYO 146-8501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ata, Yosuke Susono, JP 4 6
Inami, Masahiro Izunokuni, JP 3 4
Mori, Hironori Mishima, JP 24 242
Otani, Katsumi Tsukubamirai, JP 11 88
Sato, Akinori Mishima, JP 61 717

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00