Connecting structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9688446
APP PUB NO 20150043967A1
SERIAL NO

14478070

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connecting structure is provided for connecting a first member and a second member, wherein the first member comprises a connecting upright portion and a plurality of locking flanges provided to extend outwards along the circumferential direction of the outer face of the connecting upright portion, while the second member comprises a connecting side-wall portion that overlies the connecting upright portion and a plurality of locking projections provided to extend inwards from the inner face of the connecting side-wall portion. The bottom faces of the locking flanges distend downwards in a convex curved shape and, when the second member is overlaid on the first member and rotated, the upper faces of the locking projections are guided with sliding contact along the convex curved bottom faces of the locking flanges and stopped at the lowermost position of the convex curved bottom faces.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakamura, Kohei Hokkaido, JP 60 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00