Non-destructive methods for noble metal loading analysis on material surfaces

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9689856
APP PUB NO 20160299115A1
SERIAL NO

15094892

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Compositions and methods are provided for assessing the presence or absence, and optionally quantitating, the surface loading of a noble metal such as platinum on the surface of a substrate. The invention utilizes the decomposition rate of hydrogen peroxide (H2O2) or other redox active molecule following exposure to the substrate surface to effectively establish a qualitative or quantitative correlation between the redox agent survival fraction and the presence or absence of noble metal (e.g., platinum), and further, for the quantitation of noble metal loading on the substrate surface. The invention finds applicability in assessing the surface loading of noble metals on the internal surfaces of boiling water nuclear reactor plants (BWR) that have undergone prior noble metal application.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ELECTRIC POWER RESEARCH INSTITUTE, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Diaz, Thomas Pompilio San Martin, US 10 100
Garcia, Susan Elaine Paso Robles, US 6 7
Hettiarachchi, Samson Menlo Park, US 39 357
Pathania, Rajeshwar Singh Sunnyvale, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00