Device, system and method for geological-time refinement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9690002
SERIAL NO

14743118

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device, system and method for performing a 3D interpolation in a 2D interpolation stage and a 1D interpolation stage to generate a refined geological-time. A 3D model may be obtained of a subsurface region defined by an initial geological-time in the past when particles in the subsurface region are determined to have been originally deposited. The stages of the 3D interpolation may include a 2D interpolation along one or more initial 2D reference horizon surfaces to generate one or more reshaped 2D reference horizon surfaces, and a 1D interpolation based on the initial geological-time along one or more 1D interpolation lines to generate a refined geological-time, wherein each 1D interpolation line is approximately orthogonal to the initial 2D reference horizon surfaces. The 3D model may be displayed according to the refined geological-time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EMERSON PARADIGM HOLDING LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mallet, Jean-Laurent Luxembourg-Beggen, LU 35 694
Tertois, Anne-Laure Saint Cyr la Riviere, FR 13 134

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00