Grid-friendly data center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9691112
SERIAL NO

13907084

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and arrangements for calculating a power budget. Data are received, the data including data relating to a current state of an electrical grid at a power-drawing location which draws at least one variable electrical load, the at least one variable electrical load being subject to variable pricing. At least one prediction is determined, the at least one prediction pertaining to a future state of the electrical grid and a future electrical load to be drawn at the power-drawing location. A power budget is thereupon calculated, with respect to the power-drawing location, based on the data and the at least one prediction. Other variants and embodiments are broadly contemplated herein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION;UNIVERSITI BRUNEI DARUSSALAM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arya, Vijay Bangalore, IN 39 206
De, Silva Liyanage Chandratilak Negara, BN 4 12
Ganu, Tanuja Hrishikesh Bangalore, IN 6 22
Husain, Saiful A Brunei, BN 5 11
Kalyanaraman, Shivkumar Bangalore, IN 89 1254
Kumar, Ashkok Pon Bangalore, IN 1 1
Mylavarapu, Swarna Latha Bangalore, IN 2 91
Seetharamakrishnan, Devasenapathi Periagraharam Bangalore, IN 11 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00