Vibration electricity generation device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9692287
APP PUB NO 20150270765A1
SERIAL NO

14725022

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vibration electricity generation device according to an embodiment of the present invention includes a fixed unit provided with a coil and a movable unit provided with a magnet. The movable unit is supported on the fixed unit in a suspended manner via a pair of coil springs. The movable unit is thus configured to vibrate in the up and down direction with a rather simple structure. A coil supporting member of the fixed unit is configured to cover a coil accommodating portion from both thickness direction sides thereof and a friction reducing treatment is applied to the surfaces of both thickness direction sides of the coil supporting member. The coefficient of kinetic friction is thus maintained low enough and a pair of guide shafts conventionally used are not required, thereby the electricity generation efficiency being improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STAR MICRONICS CO LTDSHIZUOKA-SHI SHIZUOKA 422-8654

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsukuda, Yasunori Shizuoka, JP 50 198
Yamamoto, Koji Shizuoka, JP 384 3625

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00