Optical transmission system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9692543
APP PUB NO 20160241352A1
SERIAL NO

15027610

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A receiver is configured to have two coherent receivers using two pieces of local oscillator of optical frequencies f11 and f12 close to optical frequency f1 of signal light, the two pieces of local oscillator being controlled to have a predetermined optical frequency spacing ΔF, and a digital signal processor demodulating transmission data signal sequences based on outputs from the coherent receivers. When the frequency difference Δf1 of one of the two pieces of local oscillator from a virtual reference frequency f1′ close to the optical frequency f1 of the signal light is set, the digital signal processor obtains the frequency difference Δf2 of the other of the two pieces of local oscillator by calculating Δf1−ΔF, inputs electric signals output from the two coherent receivers, and compensates the phase rotation caused in the electric signals by frequency differences Δf1 and Δf2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NIPPON TELEGRAPH AND TELEPHONE CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamaoka, Fukutaro Tokyo-to, JP 17 10
Matsuda, Toshiya Tokyo-to, JP 21 38
Naka, Akira Tokyo-to, JP 8 158
Saito, Kohei Tokyo-to, JP 33 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00