Method for forming stratified rubber article with variable cure rate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9701081
APP PUB NO 20110146888A1
SERIAL NO

12950403

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a tread comprising two or more layers of rubber is described. The method includes the steps of: extruding a rubber compound through an extruder and a gear pump and mixing with an accelerant and then applying a continuous strip of rubber directly onto a tire building machine to form a first layer of rubber having a first cure rate; adjusting the amount of accelerant to obtain a second cure rate different than said first cure rate, and then applying a strip of rubber having a second cure rate onto the tire building machine, wherein one of the cure rates is faster than the other cure rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOODYEAR TIRE & RUBBER COMPANY THE1144 EAST MARKET STREET INTELLECTUAL PROPERTY LAW D/823 AKRON OH 44316-0001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burg, Gary Robert Massillon, US 50 202
D'Sidocky, Richard Michael Ravenna, US 32 201
Dando, Rebecca Lee Uniontown, US 9 70
Pulford, Carl Trevor Ross Akron, US 22 111
Stuber, Neil Phillip Munroe Falls, US 4 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00