Hybrid steam generation with carbon dioxide recycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9702237
SERIAL NO

14183000

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods relate to recovering hydrocarbons by injecting into a reservoir outputs from two different types of steam generators along with carbon dioxide, enabling lower fuel consumption for such a hybrid-based approach versus either type of steam generator alone. One steam generator vaporizes water by thermal transfer from combustion with exhaust from the combustion remaining separated from the steam. Since this type of steam generator outputs a limited carbon dioxide concentration with the steam, at least part of the carbon dioxide injected comes from recycling the carbon dioxide separated out of production fluids recovered from the reservoir. Another steam generator produces the steam by direct water contact with combustion products to produce a resulting fluid including the steam and additional carbon dioxide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CONOCOPHILLIPS COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Macadam, Scott Calgary, CA 34 718
Scinta, James Sun City Center, US 11 98
Seaba, James Calgary, CA 15 64

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00