Multi-layered gas-filled bladder for accommodating changes in fluid characteristics within a fluid delivery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9702495
SERIAL NO

14806205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An absorber for use in a fluid delivery system is disclosed which includes a housing defining an interior chamber, a connective fitting extending from the housing in fluid communication with the interior chamber for connecting the housing to the fluid delivery system, and at least one gas-filled bladder or cell disposed within the interior chamber of the housing to accommodate changes in fluid characteristics, such as, for example, pressure and volume, within the fluid delivery system, the gas-filled bladder or cell having a predetermined pre-charge pressure and a multi-layered flexible polymeric shell including a plurality of successive relatively thin polymeric shell layers to inhibit the formation of leak paths through the shell in the event that a single shell layer fails.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMTROL LICENSING INC1400 DIVISION ROAD WEST WARWICK RI 02893

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cogliati, Michael Warwick, US 14 17
Van, Haaren Christopher A Warwick, US 27 210

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00