Method and system for producing energy from waste

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9702552
APP PUB NO 20130300121A1
SERIAL NO

13698254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system for the conversion of waste into energy in a sealed system where combustion does not take place and the operating pressure prior to the inlet of the steam or power generating equipment is maintained below atmospheric pressure. Destruction of the RDF (refuse derived fuel) is accomplished by subjecting the RDF to a high temperature environment under controlled conditions in a purpose designed and built reactor. The high temperature environment, <5000° C., is achieved through the use of one or more non-transferred plasma torches for generation of plasma gas. The plasma gas exiting the torch and provides the thermal energy for the continual gasification of metallurgic coke configured as a carbon bed in the lower part of the reactor, which acts as a thermal catalyst and this provides the thermal energy for the gasification process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GREEN ENERGY AND TECHNOLOGY SDN BHD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ali, Mazlan Taman Setiawangsa, MY 4 49
Mohd, Shariff Siti Fatimah Taman Setiawangsa, MY 4 49
Webb, Christopher John Newbury, GB 8 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00