Hybrid-HDD policy for what host-R/W data goes into NAND

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9703699
SERIAL NO

14489365

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a cache policy for a hybrid drive having a magnetic storage device and a non-volatile solid-state device, the hybrid drive is configured to write the most recent version of data associated with a logical block address to the non-volatile solid-state device when the logical block address is associated with previously written data and is overlapped by a subsequent disk write operation. Advantageously, the most recent version of data associated with the overlapped logical block address is stored in cache in the non-volatile solid-state device, even when the subsequent disk write operation results in the overlapped logical block address being trimmed from cache or otherwise invalidated. Consequently, data associated with the overlapped logical block address can be accessed more quickly than data written to the magnetic storage device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dunn, Eric R Cupertino, US 25 171
Ehrlich, Richard M Saratoga, US 141 1864

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00