Composite structure of graphene and carbon nanotube and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9704611
SERIAL NO

14748954

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses a composite structure of graphene and carbon nanotube and a method of manufacturing the same. The composite structure includes graphene platelets and carbon nanotubes, each carbon nanotube growing perpendicular to the planar surface of the graphene platelet. The method includes steps of graphene platelets preparation, chemical precipitation, chemical reduction and carbon nanotube growth. Metal particles are first formed on the graphene platelets through the steps of chemical precipitation and electrochemical reduction, and carbon nanotubes grow in the step of carbon nanotube growth through thermal treatment. Thus, the graphene platelets and the carbon nanotubes of the present invention form a three dimensional structure, and the carbon nanotubes are used as three dimensional spacers and configured between the graphene platelets, which are effectively separated and hard to aggregate or congregate together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENERAGE INCNO 5 LIGONG 3RD RD WUJIE TOWNSHIP YILAN COUNTY 26841

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsieh, Cheng-Yu Yilan County, TW 71 351
Peng, Cheng-Shu Yilan County, TW 22 59
Wu, Mark Y Yilan County, TW 29 122

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00