Hybrid electric generator set

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9705357
APP PUB NO 20150200564A1
SERIAL NO

14671291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A portable generator system provides power to a load source including an engine and a generator. The engine drives the generator to provide a generator alternating current (AC) electrical power output. An energy storage system (ESS) provides an ESS direct current (DC) electrical power output. A first inverter is connected to the generator for receiving the generator AC electrical power output and for providing a DC power output. A second inverter is connected to the first inverter and the ESS for receiving the DC power output from the first inverter and the ESS DC electrical power output for providing an AC power output. A first power mode includes the generator maintaining a first generator power output level corresponding to a specified power requirement of a load source, and the ESS providing an additional first ESS power output level for satisfying the specified power requirement of the load source.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAE SYSTEMS CONTROLS INC1098 CLARK STREET ENDICOTT NY 13760

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Apalenek, Thomas Rancho Cucamonga, US 2 28
Lu, Gordon Vestal, US 4 39
Pasterski, Stephen Castle Creek, US 2 28
Quigley, Thomas Newark Valley, US 74 1529

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00