Using harmonic component(s) to calculate a temperature of a semiconductor device in an inverter module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9705487
SERIAL NO

14193561

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling the temperature of a first semiconductor device on an inverter module of a drive configured to drive an electrical machine is disclosed. The method comprises calculating at least one harmonic component of at least one power loss of at least the first semiconductor device; using the at least one harmonic component of the at least one power loss of the at least the first semiconductor device to calculate a temperature of the first semiconductor device; and if the calculated temperature of the first semiconductor device does not meet a predetermined temperature condition, issuing a command to control the operation of the drive such that the temperature of the first semiconductor device is changed to meet the predetermined temperature condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIDEC CONTROL TECHNIQUES LIMITEDTHE GRO POOL ROAD NEWTOWN POWYS SY16 3BE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cade, Michael Newtown, GB 6 35
James, Gareth Christopher Oswestry, GB 3 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00