Porous implant material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9707321
APP PUB NO 20130230734A1
SERIAL NO

13884203

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Porous implant material having a plurality of metal bodies having different porosity rates which are bonded with each other at bonded-boundary surface F parallel to a first direction, wherein: a bonded body of the metal bodies has an entire porosity rate of 50% to 92%; the metal body having higher porosity rate is a porous metal body having a three-dimensional network formed from a continuous skeleton in which a plurality of pores are interconnected; the metal body having lower porosity rate has a porosity rate of 0 to 50% and an area-occupation rate of 0.5% to 50% in a cross-section surface orthogonal to an axial direction which agrees with the first direction along the bonded-boundary surface; and a compressive strength compressing in a direction parallel to the bonded-boundary surface is 1.4 times to 10 times of a compressive strength compressing in a direction orthogonal to the bonded-boundary surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI MATERIALS CORPORATION2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 100-8117

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daigo, Yuzo Kitamoto, JP 17 91
Kato, Komei Saitama, JP 22 234
Ohmori, Shinichi Kitamoto, JP 20 174

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00