System, method and railway carriage for the rail-bound transportation of objects

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9707977
SERIAL NO

14118131

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a system and method for the rail-bound transportation of objects, e.g. for delivering or collecting material to and/or from railway working vehicles, comprising several interconnected railway carriages (1), which respectively comprise at least one conveyor track (6, 7) on which the objects can be driven in a longitudinal manner in relation to the railway carriages (1) and which are designed such that the conveyor tracks (6, 7) join together the interconnected railway carriages (1). According to the invention, said system comprises conveyor bodies (8) for the objects, said bodies being designed to move from one railway carriage (1) to another railway carriage (1) along the conveyor tracks (6, 7) which are connected one to the other. The invention also relates to suitable railway carriages therefor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • K & K MASCHINENENTWICKLUNGS GMBH & CO. KG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dehmel, Wolfram Peter Passau, DE 3 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00