Process and plant for ammonia-urea production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9708250
SERIAL NO

14007100

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for ammonia-urea production where: liquid ammonia produced in an ammonia section is fed to a urea section directly at the ammonia synthesis pressure, and where the liquid ammonia is purified at high pressure with the steps of: cooling the liquid ammonia (20) obtaining a cooled liquid ammonia stream (21), separating a gaseous fraction (22) comprising hydrogen and nitrogen from said cooled liquid ammonia, obtaining purified liquid ammonia (23) at a high pressure, and reheating said purified liquid ammonia (23) after separation of said gaseous fraction, obtaining a reheated purified ammonia (24) having a temperature suitable for feeding to the urea synthesis process. The application also deals with an ammonia-urea plant comprising an ammonia cooler, a liquid-gas separator and an ammonia re-heater and with a method for revamping existing ammonia-urea plants.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CASALE SAVIA GIULIO POCOBELLI 6 LUGANO 6900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Badano, Marco Como, IT 12 65
Filippi, Ermanno Castagnola, CH 124 498
Scotto, Andrea Breganzona, CH 18 39
Zardi, Federico Breganzona, CH 46 166

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00