Pop-up drain stopper linkage assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9708803
APP PUB NO 20170183851A1
SERIAL NO

14983092

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pop-up drain stopper linkage assembly contains: a lift rod, a drain base, a connector, a threaded rod, a threaded sleeve, a driving rod, and a drain stopper. The lift rod is pulled upward or pressed downward by a user after extending through the basin. The drain base is disposed on the basin and includes an outlet. The connector is fixed on the drain base. The threaded rod is connected with the lift rod and moves vertically in response to the lift rod. The threaded sleeve screws with and moves vertically in response to the threaded rod and includes a first retaining portion. The driving rod includes a first segment, a second segment, a spherical ball, and plural second retaining portions. The drain stopper is secured on the drain base and includes a bottom end moving vertically in response to a lever movement of the driving rod.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBE UNION INDUSTRIAL CORP.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Chunhung Taichung, TW 20 159
Lin, Yiping Taichung, TW 26 195

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00