Condenser

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9708936
APP PUB NO 20150252693A1
SERIAL NO

14431421

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The condenser which has a thin heat transfer pipe group, a main body trunk, and an intermediate trunk, and which generates condensed water by causing steam discharged from a steam turbine to flow from an upper section of the intermediate trunk, and by bringing the steam into contact with the thin heat transfer pipe group. In the intermediate trunk, upstream side heaters and downstream side heaters are arranged so as to be parallel to each other in a steam flowing direction. The downstream side heaters and turbine bypass pipes are arranged at the same position in the steam flowing direction. The length of a gap between the upstream side heaters and the downstream side heaters, and the turbine bypass pipes is set to be equal to or shorter than the radius of the turbine bypass pipes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HITACHI POWER SYSTEMS LTD3-1 MINATOMIRAI 3-CHOME NISHI-KU YOKOHAMA KANAGAWA 220-8401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukui, Akira Tokyo, JP 62 350
Hiraoka, Satoshi Tokyo, JP 71 418
Nagai, Naonori Tokyo, JP 6 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00