Method for constructing universal LED bulb, snap ring structured LED bulb and LED lamp

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9709248
APP PUB NO 20150184837A1
SERIAL NO

14416345

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for constructing a universal LED bulb, a snap ring structured LED bulb and a lamp. The constructing method comprises: supporting an optical engine core member of the LED bulb in the lens snap ring (8) using a lens snap ring (8) as a supporting main body, using an inner snap ring (81) provided on the inner side of a light distribution optical lens (7) in the optical engine core member as an auxiliary supporting structure, and further using the inner snap ring (81) as an installation base of an optical engine module (4) and a heat conductive bracket (3) or an installation base of an LED bulb radiator (103); the optical engine core member of the LED bulb is composed of the heat conductive bracket (3), the optical engine module (4), the inner snap ring (81) and the light distribution optical lens (7).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUIZHOU GZGPS CO LTDHONGTAISHIJIA28D SHINAN ROAD NANMING GUIYANG GUIZHOU 550002

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Jiqiang Guizhou, CN 12 130
Zhang, Zheyuan Guizhou, CN 18 131

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00