Asynchronous AC measurement system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9709612
APP PUB NO 20160252550A1
SERIAL NO

15154346

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Accurate measurements of electrical power at various points of a power grid is becoming more important and, at the same time, is getting more difficult as the old power distribution model of a few, large power generating stations and a multitude of relatively linear loads is replaced by a newer model containing a multitude of smaller, and to some degree unpredictable power sources, as well as a multitude of not always linear and often smart (essentially also unpredictable) loads. Embodiments of the invention provide for high accuracy voltage, current and power measurements of quasi-stationary and stationary waveforms in single and multiple phase power systems. Precision AC voltage, current, phase, power and energy measurements in power networks may be measured with current ranges from 1 mA to 20 kA and voltage ranges from 1V to 1000 kV and in a frequency range from a few hertz to one hundred kilohertz.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUILDLINE INSTRUMENTS LIMITED21 GILROY STREET BOX 99 SMITHS FALLS K7A 4S9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barczyk, Tomasz Ottawa, CA 13 38
Miljanic, Petar Belgrade, RS 5 43
Page, Iain Ottawa, CA 5 255

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00