Polarization control of pulsed light beam

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9709897
SERIAL NO

14925641

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A photolithography system includes an optical system, an actuation apparatus, and a control module. The optical system includes an optical source that produces a pulsed light beam traveling along a beam path; a plurality of optical components positioned between the optical source and a photolithography exposure apparatus, at least some of the plurality of optical components configured to receive the pulsed light beam and direct the pulsed light beam to the photolithography exposure apparatus; and an optical element positioned to interact with the pulsed light beam. The actuation apparatus is coupled to the optical element. The actuation apparatus is configured to adjust a physical property of the optical element based on a control signal from the control module to thereby adjust a polarization of the pulsed light beam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CYMER LLC17075 THORNMINT COURT SAN DIEGO CA 92127

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lalovic, Ivan B San Francisco, US 2 20
Mason, Eric Anders San Diego, US 20 26
Rafac, Robert Jay Encinitas, US 28 96
Rechtsteiner, Gregory Allen San Diego, US 9 39
Zurita, Omar San Diego, US 11 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00