Simulataneous gas chromatograph analysis of a multi-stream natural gas upgrade generated through a multi-membrane process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9714925
APP PUB NO 20160146764A1
SERIAL NO

14548432

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas chromatographic method for analyzing natural gas and a natural gas upgrading system using the gas chromatographic method for analyzing natural gas. The method includes transporting the natural gas through a chiller, transporting the natural gas from the chiller to at least two gas upgrading membranes, and operating a gas chromatographic system having at least one upstream gas chromatograph and at least two downstream gas chromatographs. The at least one upstream gas chromatograph, the first downstream gas chromatograph, and the second downstream gas chromatograph all operate simultaneously and utilize the same heating oven to heat samples of natural gas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYDHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akmal, Naim Dhahran, SA 18 53
Al-Khawajah, Anwar H Dammam, SA 3 21
Al-Shahrani, Saeed Hasan Dammam, SA 1 3
Ballaguet, Jean-Pierre R Thenisy, FR 19 147
Duval, Sebastien A Neuilly sur Seine, FR 47 167
Vaidya, Milind M Auburndale, US 37 161

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00