High permeable porous substrate for a solid oxide fuel cell and the production method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9716277
SERIAL NO

14681532

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high permeable porous substrate for a solid oxide fuel cell and a production method to produce the substrate are provided. The high permeable porous substrate for a solid oxide fuel cell includes a porous substrate body and a plurality of channels. The plurality of channels penetrate the first surface of the porous substrate body and does not penetrate the second surface of the porous substrate body. In addition, a production method for the high permeable porous substrate of a solid oxide fuel cell is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INSTITUTE OF NUCLEAR ENERGY RESEARCH ATOMIC ENERGY COUNCIL, EXECUTIVE YUAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Chun-Liang Taoyuan, TW 14 37
Cheng, Shih-Wei Taoyuan, TW 21 52
Chuang, Shie Zong-Yang Taoyuan, TW 4 4
Huang, Te-Jung Taoyuan, TW 5 6
Hwang, Chang-Sing Taoyuan, TW 19 64
Tsai, Chun-Huang Taoyuan, TW 21 65
Yang, Sheng-Fu Taoyuan, TW 15 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00