System and method for controlling a wind farm

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9716384
SERIAL NO

12863472

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

System and method for controlling a wind farm, for wind farms comprising a plurality of wind turbines having a rotor, a generator, a control unit and connections to the mains of the wind farm, the wind turbines generating reactive power according to the instructions of the wind farm control system, the control system calculating a global reactive power demand to be produced by the whole wind farm on the basis of the voltage at the connection point or the power factor required, and the control system sending reactive power instructions to the wind turbines of the farm, the control system receiving information based on one or more parameters indicating the level of heating of the electrical components of the wind turbines, the generation of reactive power being distributed between the various wind turbines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ACCIONA WINDPOWER, S.A.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alonso, Sadaba Oscar Navarra, ES 5 76
Arlaban, Gabeiras Teresa Navarra, ES 43 169
Nuñez, Polo Miguel Navarra, ES 12 125
Royo, Garcia Ricardo Navarra, ES 8 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00