Photovoltaic installation and method of operating the installation with delayed battery connection in case of an emergency request

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9716406
SERIAL NO

14185265

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A photovoltaic system has a plurality of subsystems, each with a photovoltaic generator and an associated inverter. The inverter has a control element for setting the maximum power point of its subsystem. A battery is connectible in parallel with the photovoltaic generator. The inverters are connectible to a power grid, which is operated by a utility operator. When a control device receives an emergency signal from the utility operator indicating impending instability of the grid, the following is initiated: If the battery voltage is above the current voltage as set by the MPP control element, the battery is immediately connected to the input of the inverter while the generator remains connected to the inverter. If the battery voltage is below the current voltage the battery connection is delayed until the MPP control element has adjusted the voltage. Then the voltage is further lowered to generate a discharge current from the battery.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ADENSIS GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beck, Bernhard Ot Dimbach, DE 54 918

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00