Energy saving system and method for devices with rotating or reciprocating masses

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9716449
SERIAL NO

14242055

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method are provided for reducing the energy consumed by a pump jack electric motor by reducing the supply voltage to the motor when the motor would be generating energy in open loop mode. By substantially eliminating the energy generation mode, the braking action of the utility grid in limiting the acceleration of the motor and system that would otherwise occur is substantially removed. The motor and system will speed up, allowing the natural kinetic energy of the cyclic motion to perform part of the pumping action. In particular, when the energy consumption for the electric motor connected with the device having a rotating or reciprocating mass goes to zero, the line voltage to the motor is switched off, causing the frequency of the voltage across the motor terminals to increase. When the period of the voltage across the motor terminals returns to substantially the same as the period of the line voltage, the line voltage is switched on or reapplied to the motor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE POWERWISE GROUP INCFLA FLORIDA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kelley, Paul H Boca Raton, US 10 199
Lumsden, John L Boca Raton, US 20 657
Venkataraman, Vasan Fort Lauderdale, US 11 127

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00