Current control circuits

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9717126
SERIAL NO

15208888

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A current control circuit for a driving circuitry system of an LED component is provided. In the driving circuitry system, a rectifier provides a rectified voltage to an anode of the LED component, and a current module sets a current flowing through the LED component. In the current control circuit, input and output terminals of a voltage regulator are respectively coupled to the input terminal of the current module and a non-inverting input terminal of an operational amplifier. An inverting input terminal of the operational amplifier is coupled to an output terminal of the current module, and an output terminal thereof is coupled to one terminal of a capacitor. An output-terminal voltage of the first operational amplifier is provided as a reference voltage for the current module. One terminal of a resistor is coupled to the inverting input terminal of the operational amplifier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PRINCETON TECHNOLOGY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meng, Xin New Taipei, TW 29 163
Zhang, Shengyou New Taipei, TW 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00